I also picked up a Kohler toilet that was on sale at Home Depot. There is new trim on the floor, and new heating covers on the baseboard heaters. I straightened out the fins so hopefully it will keep it pretty warm in there. Also began the installation of the shower fixtures. That's a pretty simple job, but I didn't want to make a 5th trip to Home Depot for the day for the missing part that was needed.
This is my running documentation for renovations and updates done to my first property. I wanted to keep track of my progress from start to finish, so that I can see the changes the house went through years later.
Sunday, March 4, 2012
Bathroom updates
A lot of good progress this weekend in the bathroom. All the grouting was finished, which is a huge relief. I chose to use an epoxy grout, which is impenetrable and maintenance free, it never has to be sealed. The problem is that you have to be careful using it to make sure no residue is left anywhere, because after 24 hours it basically becomes permanent. Luckily I didn't have any issues.
I also picked up a Kohler toilet that was on sale at Home Depot. There is new trim on the floor, and new heating covers on the baseboard heaters. I straightened out the fins so hopefully it will keep it pretty warm in there. Also began the installation of the shower fixtures. That's a pretty simple job, but I didn't want to make a 5th trip to Home Depot for the day for the missing part that was needed.
I also picked up a Kohler toilet that was on sale at Home Depot. There is new trim on the floor, and new heating covers on the baseboard heaters. I straightened out the fins so hopefully it will keep it pretty warm in there. Also began the installation of the shower fixtures. That's a pretty simple job, but I didn't want to make a 5th trip to Home Depot for the day for the missing part that was needed.
Tuesday, February 28, 2012
Shower tiling finished
The tiling is finished in the shower. I put an accent row in of smaller porcelain tiles to break up the 20"x20" porcelain tiles on the rest of the walls. There was an unlevel area, and using the big tiles would have been difficult, so it was as much for function as it was for aesthetics. I'm happy with how it came out. Now onto the big project of grouting this with my first try at epoxy grout.
Monday, February 27, 2012
Bathroom floor tiled
The bathroom floor has been tiled. I can't say how glad I almost all of the tiling is done in the house now. All that is left is the entrance way to the house, which isn't a big area. Now all that's left for the floors is to grout them, but I'll be waiting to do it all at once with the shower.
Monday, February 20, 2012
Monday, February 13, 2012
Bathroom updates
It's time to start tiling. The sheet rock is all in place, joint compound applied and sanded, and Redguard rolled on to waterproof the shower.
Monday, February 6, 2012
Tree Removal
Time to get rid of some trees that were hanging over my roof, and make the yard a little bigger. My insurance company had me in a higher premium because of potential branches coming down on/through my roof. I had four trees total removed, including one big oak on the side of the garage that isn't pictured.
Bathroom Begins
Time to start putting things together in the bathroom. We picked up a fiberglass bathtub and got the plumbing all hooked up finally. New Hardiboard has gone up as well. I settled on a tile to use around the room. I'm going w a 20"x20" tile to keep the grout lines in the shower to.a minimum.
I also picked up some unfinished cabinets at Lowes to make a bathroom vanity with. To get the size I needed for the alcove would cost $900 (Home Depot's quote). These unfinished cabinets cost $250.